CASE STUDY

Kinetic Games

PROJECT DETAILS
Location
Southampton, Hampshire
Date
October 2025
1
Customer Satisfaction

PROJECT DESCRIPTION

How we made it happen

Stevens Washrooms delivered a distinctive washroom refurbishment for Kinetic Games, completed in October 2025. The brief called for a scheme that celebrated the character of the existing building while introducing a refined, contemporary edge. Our solution balances rich, dark surfaces with warm timber tones and robust, modern finishes to create a dramatic yet welcoming environment.

Design Concept

The design contrasts deep, matte Egger U999 PM Black laminate to the walls and integrated cubicle systems with the original exposed timber beams framing the windows, highlighting the building’s rustic charm. Vanity panels in Egger H1318 Natural Wild Oak MFC echo the natural wood tones, adding warmth and texture. The palette is anchored by Matera Lava tiles from Solus Ceramics, offering a concrete-effect finish that ties together the dark laminate and raw timber elements.

Key Features

  • Cubicles, IPS & Wall Cladding: Deep matte Egger U999 PM Black laminate for a velvety, modern backdrop with strong visual impact.
  • Vanity Units: Egger H1318 Natural Wild Oak MFC vanity panels introducing warmth and reinforcing the link to the exposed structural timber.
  • Tiling: Matera Lava wall and floor tiles from Solus Ceramics providing a contemporary, concrete-effect finish that grounds the overall scheme.
  • Heritage Integration: Design carefully aligned to frame and celebrate the original exposed beams as key visual features.
  • Works Package: Strip out, demolition, builders’ works, laminate systems, vanities, mirrors, accessories, sanitaryware, and full wall and floor tiling delivered by Stevens Washrooms.

Outcome

The completed washrooms achieve a sophisticated fusion of rustic character and modern design. By thoughtfully combining dark laminate, natural timber tones, and concrete-effect tiling, we have created a bold, immersive environment that reflects both the heritage of the building and the contemporary identity of Kinetic Games.

IMAGE GALLERY

See the amazing results

At Stevens Services, we believe that quality and design go hand-in-hand. This project is a testament to our ability to deliver exceptional results that not only meet but exceed our clients’ expectations.

HAVE A PROJECT IN MIND

Arrange a Site Visit

Please contact us for more information or to arrange a site visit to discuss your new or replacement washroom.

Following our visit, we will provide you with a fast, no obligation quote. On receipt of your order work on your washroom can generally commence within 6 – 8 weeks. Alternatively, providing a sufficient lead time is allowed we will endeavour to fit in with your time schedule. All prices quoted will be valid for a period of 3 months.